Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Long-term monitoring of a reinforced earth bridge abutment at Carmarthen : 1984 to 1994
Long-term monitoring of a reinforced earth bridge abutment at Carmarthen : 1984 to 1994
Long-term monitoring of a reinforced earth bridge abutment at Carmarthen : 1984 to 1994
Brady, K. C. (Autor:in) / Barratt, D. A. (Autor:in) / McMahon, W. (Autor:in)
TRL report ; 124
1995
20 S
Ill., graph. Darst
Langzeitarchivierung durch Technische Informationsbibliothek (TIB) / Leibniz-Informationszentrum Technik und Naturwissenschaften und Universitätsbibliothek
Buch
Englisch
BKL:
56.23
Brückenbau
Performance of a reinforced earth bridge abutment at Carmarthen
TIBKAT | 1987
|Large-Scale Testing and Long-Term Monitoring of Reinforced Earth Abutment – A Case Study
BASE | 2023
|Large-Scale Testing and Long-Term Monitoring of Reinforced Earth Abutment – A Case Study
DOAJ | 2023
|Earth pressure model to predict the long-term performance of integral abutment bridge
Taylor & Francis Verlag | 2024
|