How Risk-Informed Decisions Can Fail: Lessons from a Nuclear Power Plant Incident
In 2002, a large hole was discovered in the reactor vessel head of the Davis-Besse plant located in Ohio, US. Had the reactor pressure vessel ruptured, a major public safety event would have occurred. Further investigations revealed that, by the end of 2001, a shutdown order was drafted by the Regulatory Agency. Nonetheless, through a risk-informed decision-making approach, the Agency changed the decision related to the issuance of the order. Operations were then allowed to continue for six more weeks, despite the high likelihood that the reactor was operating with leaking cracks in the nozzles located at the reactor head. The reactor vessel head wastage, which had evolved unnoticed for years, was primarily due to borated water that leaked through a nozzle crack onto the carbon steel portion of the reactor head, resulting in boric acid corrosion. This paper aims to explore the Agency’s decision-making to identify factors that might have contributed to the flawed decision. A better comprehension on the organizational factors and social processes that can adversely affect risk-informed decisions is crucial to enhance operational safety in high hazard industries. The paper concludes by suggesting possible ways to guard against the identified factors.
How Risk-Informed Decisions Can Fail: Lessons from a Nuclear Power Plant Incident
In 2002, a large hole was discovered in the reactor vessel head of the Davis-Besse plant located in Ohio, US. Had the reactor pressure vessel ruptured, a major public safety event would have occurred. Further investigations revealed that, by the end of 2001, a shutdown order was drafted by the Regulatory Agency. Nonetheless, through a risk-informed decision-making approach, the Agency changed the decision related to the issuance of the order. Operations were then allowed to continue for six more weeks, despite the high likelihood that the reactor was operating with leaking cracks in the nozzles located at the reactor head. The reactor vessel head wastage, which had evolved unnoticed for years, was primarily due to borated water that leaked through a nozzle crack onto the carbon steel portion of the reactor head, resulting in boric acid corrosion. This paper aims to explore the Agency’s decision-making to identify factors that might have contributed to the flawed decision. A better comprehension on the organizational factors and social processes that can adversely affect risk-informed decisions is crucial to enhance operational safety in high hazard industries. The paper concludes by suggesting possible ways to guard against the identified factors.
How Risk-Informed Decisions Can Fail: Lessons from a Nuclear Power Plant Incident
Monteiro, Gilsa P. (Autor:in) / Frutuoso e Melo, Paulo Fernando F. (Autor:in)
ACS Chemical Health & Safety ; 29 ; 192-201
28.03.2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Study on risk-informed in-service inspection for nuclear power plant piping
British Library Conference Proceedings | 2010
|Lessons from pyrophoricity incident
Engineering Index Backfile | 1957
|Civil Works and Dam Safety: Incorporating Risk-Informed Decisions
British Library Online Contents | 2010
|Civil Works and Dam Safety: Incorporating Risk-Informed Decisions
Online Contents | 2010
|Risk Management to Make Informed, Contingency-Based CIP Decisions
British Library Conference Proceedings | 2010
|