Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prototype Spillway Performance Verification
The flow performance of a prototype closed conduit spillway which could not be explained analytically was verified by a physical model. During the falling stage of the outflow from the reservoir, full conduit flow was observed in the Marsh Creek spillway even though the pool level was below the spillway crest. Engineers inspecting the spillway could not agreeably explain the flow performance. A physical model of the prototype was built and tested to verify the prototype performance. Tested with open and closed air vents, the model demonstrated the hysteresis shown in the falling limb of the prototype head-discharge relationship and the siphon-regulated flow observed in the prototype. Model observations indicate that the prototype flow control problem is the result of inadequate venting of the covered-top drop inlet.
Prototype Spillway Performance Verification
The flow performance of a prototype closed conduit spillway which could not be explained analytically was verified by a physical model. During the falling stage of the outflow from the reservoir, full conduit flow was observed in the Marsh Creek spillway even though the pool level was below the spillway crest. Engineers inspecting the spillway could not agreeably explain the flow performance. A physical model of the prototype was built and tested to verify the prototype performance. Tested with open and closed air vents, the model demonstrated the hysteresis shown in the falling limb of the prototype head-discharge relationship and the siphon-regulated flow observed in the prototype. Model observations indicate that the prototype flow control problem is the result of inadequate venting of the covered-top drop inlet.
Prototype Spillway Performance Verification
Anderson, Clayton L. (Autor:in) / Blaisdell, Fred W. (Autor:in)
Journal of the Hydraulics Division ; 105 ; 707-720
01.01.2021
141979-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Spillway tests confirm model-prototype conformance
UB Braunschweig | 1954
|Spillway tests confirm model-prototype conformance
Engineering Index Backfile | 1954
Model and prototype studies on unique spillway
Engineering Index Backfile | 1946
|Conformity between model and prototype tests -- Madden dam spillway
Engineering Index Backfile | 1941
|