Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Big Accomplishment
Completed in 2011, the Willamette River Combined Sewer Overflow (CSO) Tunnel Program, in Portland, Oregon, has vastly reduced overflows while improving the water quality of the river. As the second of the two major projects in the undertaking referred to locally as the Big Pipe, the recently completed 5.5 mi long East Side CSO Tunnel featured one of the first uses of a slurry mix–shield tunnel-boring machine in North America and the continent’s longest microtunneling drive ever.
Big Accomplishment
Completed in 2011, the Willamette River Combined Sewer Overflow (CSO) Tunnel Program, in Portland, Oregon, has vastly reduced overflows while improving the water quality of the river. As the second of the two major projects in the undertaking referred to locally as the Big Pipe, the recently completed 5.5 mi long East Side CSO Tunnel featured one of the first uses of a slurry mix–shield tunnel-boring machine in North America and the continent’s longest microtunneling drive ever.
Big Accomplishment
Cook, Roy Francis (Autor:in) / Gribbon, Paul (Autor:in) / Mariucci, Bill (Autor:in)
Civil Engineering Magazine Archive ; 82 ; 58-65
01.01.2016
82012-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
British Library Online Contents | 2012
|MMS: ACCOMPLISHMENT AND PROGRESS
British Library Online Contents | 2001
|Printmaking as artistic accomplishment
DataCite | 2023
|FEATURES - Ellicott's History of Accomplishment
Online Contents | 2000
HEC's Project Benefit Accomplishment Program
British Library Conference Proceedings | 1993
|