Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Multiplier Model for Forecasting Manpower Demand
To better manage and forecast the demand for labor in the construction industry, a mathematical model is developed using a distributed lag model and labor multiplier approach. The model is tested using economic statistics and manpower data derived from Hong Kong construction projects. The model can be used by public and private sectors to forecast future labor demand so that an optimal workforce can be attained.
Multiplier Model for Forecasting Manpower Demand
To better manage and forecast the demand for labor in the construction industry, a mathematical model is developed using a distributed lag model and labor multiplier approach. The model is tested using economic statistics and manpower data derived from Hong Kong construction projects. The model can be used by public and private sectors to forecast future labor demand so that an optimal workforce can be attained.
Multiplier Model for Forecasting Manpower Demand
Sing, Chun-pong (Autor:in) / Love, Peter E. D. (Autor:in) / Tam, C. M. (Autor:in)
Journal of Construction Engineering and Management ; 138 ; 1161-1168
14.01.2012
82012-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Multiplier Model for Forecasting Manpower Demand
Online Contents | 2012
|Multiplier Model for Forecasting Manpower Demand
British Library Online Contents | 2012
|Construction manpower demand forecasting
Emerald Group Publishing | 2011
|Forecasting Construction Manpower Demand: An Econometric Model
British Library Conference Proceedings | 2009
|Forecasting Construction Manpower Demand by Gray Model
British Library Online Contents | 2010
|