Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The object of this paper is to inform those interested in engineering matters regarding the peculiar difficulties and problems which the construction of the Pearl Harbor Dry Dock has involved. The paper contains a topographical and geological description of the location which was chosen for the dock, a review of the Congressional authorizations and appropriations for the work, a brief description of the plans and methods of construction originally adopted, an outline of the changes which were made in dimensions and details as the work proceeded, and a description of the field troubles which were experienced and of the experiments and tests conducted to determine the best means for their correction.
The object of this paper is to inform those interested in engineering matters regarding the peculiar difficulties and problems which the construction of the Pearl Harbor Dry Dock has involved. The paper contains a topographical and geological description of the location which was chosen for the dock, a review of the Congressional authorizations and appropriations for the work, a brief description of the plans and methods of construction originally adopted, an outline of the changes which were made in dimensions and details as the work proceeded, and a description of the field troubles which were experienced and of the experiments and tests conducted to determine the best means for their correction.
Pearl Harbor Dry Dock
Stanford, H. R. (Autor:in)
Transactions of the American Society of Civil Engineers ; 80 ; 223-294
01.01.2021
721916-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Engineering Index Backfile | 1916
Engineering Index Backfile | 1915
Engineering Index Backfile | 1915
Engineering Index Backfile | 1915
|Engineering Index Backfile | 1915