Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A Coffer Dam or Caisson Without Timber or Iron in its Construction
During the winter of 1888-89 the New York and Northern Railway Company determined to replace the iron bridge crossing Croton Lake with a heavier structure, one more in accordance with modern standards, to carry the rolling loads of the present day, and the writer was called upon to attend to the matter.
A Coffer Dam or Caisson Without Timber or Iron in its Construction
During the winter of 1888-89 the New York and Northern Railway Company determined to replace the iron bridge crossing Croton Lake with a heavier structure, one more in accordance with modern standards, to carry the rolling loads of the present day, and the writer was called upon to attend to the matter.
A Coffer Dam or Caisson Without Timber or Iron in its Construction
Harris, Robert L. (Autor:in)
Transactions of the American Society of Civil Engineers ; 24 ; 230-236
01.01.2021
71891-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Discussion on Caisson Without Timber or Iron
ASCE | 2021
|Engineering Index Backfile | 1905
|The construction and use of Coffer Dams
Engineering Index Backfile | 1902
|Timber and gravel coffer-dams on the troy dam
Engineering Index Backfile | 1916
|Coffer time: The development of the English coffer over the centuries
British Library Online Contents | 1999