Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipeline Partnership
Working together, two California agencies coordinated their water reuse efforts, facilitating the construction of a single transmission main, rather than the two that were originally planned. This coordination benefited both parties, particularly because the design and construction of the single 7.5 mi long pipeline required overcoming multiple logistical challenges—including poor soils, incomplete historical records, and the possibility of unexploded ordnance.
Pipeline Partnership
Working together, two California agencies coordinated their water reuse efforts, facilitating the construction of a single transmission main, rather than the two that were originally planned. This coordination benefited both parties, particularly because the design and construction of the single 7.5 mi long pipeline required overcoming multiple logistical challenges—including poor soils, incomplete historical records, and the possibility of unexploded ordnance.
Pipeline Partnership
Wegley, Michael (Autor:in) / Marshall, Jonathon P. (Autor:in)
Civil Engineering Magazine Archive ; 89 ; 62-67
01.01.2020
62019-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
British Library Conference Proceedings | 2011
|Public Private Partnership - Investitionsanreiz Public Private Partnership
Online Contents | 2009
|TIBKAT | 2008
|British Library Online Contents | 1992