Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Unbonded Transverse Posttensioning of a Railway Bridge in Haparanda, Sweden
The majority of railway lines in Sweden are designed to support axle loads of up to 250 kN. Because of increased transport needs on some lines, an axle load limit of at least 300 kN would be beneficial. To upgrade the Haparanda line in northern Sweden to 300 kN, the slabs in existing concrete trough bridges require a higher transverse shear resistance. Methods for in situ strengthening of bridge slabs in this way have not been fully developed, and this paper discusses the possibility of increasing the load capacity by horizontal prestressing. Internal, unbonded posttensioning was performed on one bridge on the Haparanda line, and the strengthening effects were investigated. The strengthening was designed according to the European Eurocode design regulations, and testing was conducted before and after the implementation. Strains in the main transverse reinforcement, caused by a train with an axle load of 215 kN, were completely counteracted by eight prestressing bars, stressed with 430 kN/bar. The results indicate that the actual strengthening effect is larger than what is predicted by the design equations. The Haparanda project showed that unbonded posttensioning can be implemented relatively fast and does not obstruct the ongoing railway traffic during installation.
Unbonded Transverse Posttensioning of a Railway Bridge in Haparanda, Sweden
The majority of railway lines in Sweden are designed to support axle loads of up to 250 kN. Because of increased transport needs on some lines, an axle load limit of at least 300 kN would be beneficial. To upgrade the Haparanda line in northern Sweden to 300 kN, the slabs in existing concrete trough bridges require a higher transverse shear resistance. Methods for in situ strengthening of bridge slabs in this way have not been fully developed, and this paper discusses the possibility of increasing the load capacity by horizontal prestressing. Internal, unbonded posttensioning was performed on one bridge on the Haparanda line, and the strengthening effects were investigated. The strengthening was designed according to the European Eurocode design regulations, and testing was conducted before and after the implementation. Strains in the main transverse reinforcement, caused by a train with an axle load of 215 kN, were completely counteracted by eight prestressing bars, stressed with 430 kN/bar. The results indicate that the actual strengthening effect is larger than what is predicted by the design equations. The Haparanda project showed that unbonded posttensioning can be implemented relatively fast and does not obstruct the ongoing railway traffic during installation.
Unbonded Transverse Posttensioning of a Railway Bridge in Haparanda, Sweden
Nilimaa, Jonny (Autor:in) / Blanksvärd, Thomas (Autor:in) / Täljsten, Björn (Autor:in) / Elfgren, Lennart (Autor:in)
22.11.2013
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Unbonded Transverse Posttensioning of a Railway Bridge in Haparanda, Sweden
Online Contents | 2014
|Unbonded Transverse Posttensioning of a Railway Bridge in Haparanda, Sweden
British Library Online Contents | 2014
|Upgrading the Haparanda Bridge - Unbonded Posttensioning
British Library Conference Proceedings | 2014
|Experimental and Numerical Evaluation of Unbonded Posttensioning Tendons Subjected to Wire Breaks
Online Contents | 2016
|Wire Breakage Detection Using Relative Strain Variation in Unbonded Posttensioning Anchors
British Library Online Contents | 2015
|