Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Side Spillways for Regulating Diversion Canals
In 1022, the Hydro-Electric Department of the Government of Tasmania completed a diversion channel of 450 sec-ft. capacity to convey water from the Upper Ouse River, at Liawenee, to the Great Lake storage. The intake of this channel is in a deep and narrow gorge where a low weir, only about 100 ft. long, suffices to divert the normal flow into a flume, 1/2 mile in length, built on a rock bench excavated along the wall of the gorge. From the outlet of the flume a canal, part of which is excavated in earth, conveys the water a farther distance of 5 miles where it is discharged into the Great Lake.
Side Spillways for Regulating Diversion Canals
In 1022, the Hydro-Electric Department of the Government of Tasmania completed a diversion channel of 450 sec-ft. capacity to convey water from the Upper Ouse River, at Liawenee, to the Great Lake storage. The intake of this channel is in a deep and narrow gorge where a low weir, only about 100 ft. long, suffices to divert the normal flow into a flume, 1/2 mile in length, built on a rock bench excavated along the wall of the gorge. From the outlet of the flume a canal, part of which is excavated in earth, conveys the water a farther distance of 5 miles where it is discharged into the Great Lake.
Side Spillways for Regulating Diversion Canals
Nimmo, W. H. R. (Autor:in)
Transactions of the American Society of Civil Engineers ; 92 ; 1561-1584
01.01.2021
241928-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Side spillways for regulating diversion canals
Engineering Index Backfile | 1928
|Side spillways for regulating diversion canals
Engineering Index Backfile | 1927
|Flood Protection of Canals by Lateral Spillways
ASCE | 2021
|