Utility Relocation Success and Challenges in a Congested Underground Network
East Bay Municipal Utility District (District) has recently completed several challenging utility relocation projects for outside agencies with large roadway and transportation construction projects. From 2014 to 2019, the District has completed the planning, design, and construction inspection of three large utility relocation projects that were in various phases of construction within the same timelines. The projects include utility relocation for the: City of Oakland’s new 10th Street Bridge construction, AC Transit Bus Rapid Transit project, and Caltrans/ACTC Interstate 880 Improvements at 23rd and 29th Street in Oakland, California. Faced with a demanding workload of relocating miles of pipeline within a short timeline in a congested public right-of-way, the District utilized their Engineering, Construction, and O&M resources and experience to meet the challenges that lay ahead. This paper discusses the lessons learned in the planning, design, and construction phases of the project and the challenges and success in resolving operational constraints, permitting, installation challenges, and negotiating financial budget and agreements with multiple agencies.
Utility Relocation Success and Challenges in a Congested Underground Network
East Bay Municipal Utility District (District) has recently completed several challenging utility relocation projects for outside agencies with large roadway and transportation construction projects. From 2014 to 2019, the District has completed the planning, design, and construction inspection of three large utility relocation projects that were in various phases of construction within the same timelines. The projects include utility relocation for the: City of Oakland’s new 10th Street Bridge construction, AC Transit Bus Rapid Transit project, and Caltrans/ACTC Interstate 880 Improvements at 23rd and 29th Street in Oakland, California. Faced with a demanding workload of relocating miles of pipeline within a short timeline in a congested public right-of-way, the District utilized their Engineering, Construction, and O&M resources and experience to meet the challenges that lay ahead. This paper discusses the lessons learned in the planning, design, and construction phases of the project and the challenges and success in resolving operational constraints, permitting, installation challenges, and negotiating financial budget and agreements with multiple agencies.
Utility Relocation Success and Challenges in a Congested Underground Network
Bueno, Rolando (Autor:in) / Morgan, Mykel (Autor:in)
Pipelines 2020 ; 2020 ; San Antonio, Texas (Conference Held Virtually)
Pipelines 2020 ; 113-118
06.08.2020
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
HDD Design and Construction Challenges of Blair Waterway Utility Relocation
British Library Conference Proceedings | 2007
|Interactions of Lean and BIM Integrated Augmented Reality in Underground Utility Relocation Projects
Springer Verlag | 2023
|Utility responsible for relocation costs
Wiley | 1983
Reduce Urban Tunnel Utility Relocation Risk Through Early Relocation by Specialty Contractor
British Library Conference Proceedings | 2017
|