Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Min-Max Linear Programming Model for Multireservoir System Operation with Power Deficit Aspect
Because of the growing demand for energy in recent years, multireservoir system operation with a power deficit aspect is becoming an increasingly important problem in electrical power systems. To satisfy this practical requirement, a min-max linear programming (LP) model is developed to determine the optimal generation of all the hydroplants so as to equally distribute electricity shortage in the scheduling horizon. The objective of the LP model is to minimize the maximum, rather than the traditional variance function, of residual load series that is obtained by subtracting the total outputs of all the hydroplants from the original load curve. Also, in the modeling process, the LP model takes a set of necessary operation constraints into account. The proposed model is applied to a classical multireservoir system with 10 coupled reservoirs. The results indicate that the proposed LP model outperforms several existing methods in smoothing the power deficit. Thus, a new perspective is provided for the operation of hydropower systems in the cases where the water head can be assumed to be a constant.
Min-Max Linear Programming Model for Multireservoir System Operation with Power Deficit Aspect
Because of the growing demand for energy in recent years, multireservoir system operation with a power deficit aspect is becoming an increasingly important problem in electrical power systems. To satisfy this practical requirement, a min-max linear programming (LP) model is developed to determine the optimal generation of all the hydroplants so as to equally distribute electricity shortage in the scheduling horizon. The objective of the LP model is to minimize the maximum, rather than the traditional variance function, of residual load series that is obtained by subtracting the total outputs of all the hydroplants from the original load curve. Also, in the modeling process, the LP model takes a set of necessary operation constraints into account. The proposed model is applied to a classical multireservoir system with 10 coupled reservoirs. The results indicate that the proposed LP model outperforms several existing methods in smoothing the power deficit. Thus, a new perspective is provided for the operation of hydropower systems in the cases where the water head can be assumed to be a constant.
Min-Max Linear Programming Model for Multireservoir System Operation with Power Deficit Aspect
Niu, Wen-jing (Autor:in) / Feng, Zhong-kai (Autor:in) / Cheng, Chun-tian (Autor:in)
20.07.2018
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Min-Max Linear Programming Model for Multireservoir System Operation with Power Deficit Aspect
British Library Online Contents | 2018
|Multireservoir Multiyield Model with Allowable Deficit in Annual Yield
British Library Online Contents | 2002
|Boolean Integer Nonlinear Programming for Water Multireservoir Operation
British Library Online Contents | 2012
|Multireservoir Multiyield Model with Allowable Deficit in Annual Yield
Online Contents | 2002
|