Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Performance Based Seismic Retrofit of the Los Angeles Downtown Women's Center Project
This paper describes the performance based seismic rehabilitation of a historic 1920's vintage 6-story non-ductile concrete shear wall building which is being remodeled to be reused as an abused/homeless women's shelter. The building is located in the blighted "skid-row" district of downtown Los Angeles and is part of the City's adaptive reuse and redevelopment program. The retrofit objective was to obtain a Life Safety performance level under BSE-1. The work followed the relevant requirements of ASCE41-06, LABC 2008 and the LADBS Adaptive Reuse Ordinance (ARO). The analysis consisted of a Linear Dynamic Procedure (LDP) used as a baseline followed by a Nonlinear Static Procedure (NSP) to capture nonlinear behavior. The retrofit scheme was implemented by adding a couple of new cast-in-place concrete shear walls and shotcreted shear walls at certain existing wall locations. Other measures included foundation augmentation, gravity column fiber-wrapping along with some roof mass reduction.
Performance Based Seismic Retrofit of the Los Angeles Downtown Women's Center Project
This paper describes the performance based seismic rehabilitation of a historic 1920's vintage 6-story non-ductile concrete shear wall building which is being remodeled to be reused as an abused/homeless women's shelter. The building is located in the blighted "skid-row" district of downtown Los Angeles and is part of the City's adaptive reuse and redevelopment program. The retrofit objective was to obtain a Life Safety performance level under BSE-1. The work followed the relevant requirements of ASCE41-06, LABC 2008 and the LADBS Adaptive Reuse Ordinance (ARO). The analysis consisted of a Linear Dynamic Procedure (LDP) used as a baseline followed by a Nonlinear Static Procedure (NSP) to capture nonlinear behavior. The retrofit scheme was implemented by adding a couple of new cast-in-place concrete shear walls and shotcreted shear walls at certain existing wall locations. Other measures included foundation augmentation, gravity column fiber-wrapping along with some roof mass reduction.
Performance Based Seismic Retrofit of the Los Angeles Downtown Women's Center Project
Hussain, Saif M. (Autor:in) / Van Benschoten, Paul (Autor:in) / Lin, Silian (Autor:in) / Johnson, David (Autor:in)
ATC and SEI Conference on Improving the Seismic Performance of Existing Buildings and Other Structures ; 2009 ; San Francisco, California, United States
07.12.2009
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Performance Based Seismic Retrofit of the Los Angeles Downtown Women's Center Project
British Library Conference Proceedings | 2009
|Seismic Retrofit Program for Los Angeles Bridges
Online Contents | 1998
|Tunneling Under Downtown Los Angeles
British Library Conference Proceedings | 2010
|Urban Challenges of the Downtown Los Angeles Regional Connector Tunnel Project
British Library Conference Proceedings | 2015
|