Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
China’s Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification
Currently, China is facing the critical window of construction on the underground comprehensive utility tunnel project. Accurate risk identification is required, as the prerequisite for the realization of reasonable risk sharing between the administration and the private sectors. Utilizing Delphi method, opinions from 10 representative experts in the professional field were investigated and collected to identify 15 categories of risk, which are faced by the PPP scheme of underground integrated corridor project in China through four rounds of consultation. By analyzing the relationship between the identified risk factors by using the analytical ISM model, it is concluded that there are progressive relations among the risk factors, and there are two sets of strong correlation factors in the system that should be regarded as the dominating risk management.
China’s Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification
Currently, China is facing the critical window of construction on the underground comprehensive utility tunnel project. Accurate risk identification is required, as the prerequisite for the realization of reasonable risk sharing between the administration and the private sectors. Utilizing Delphi method, opinions from 10 representative experts in the professional field were investigated and collected to identify 15 categories of risk, which are faced by the PPP scheme of underground integrated corridor project in China through four rounds of consultation. By analyzing the relationship between the identified risk factors by using the analytical ISM model, it is concluded that there are progressive relations among the risk factors, and there are two sets of strong correlation factors in the system that should be regarded as the dominating risk management.
China’s Underground Comprehensive Utility Tunnel Project of PPP Mode Risk Identification
Zhou, Xianhua (Autor:in) / Pan, Hongting (Autor:in) / Shen, Yunfei (Autor:in)
International Conference on Construction and Real Estate Management 2017 ; 2017 ; Guangzhou, China
ICCREM 2017 ; 318-327
09.11.2017
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Shaking table test on underground utility tunnel
British Library Online Contents | 2008
|Rapid construction equipment for urban underground utility tunnel
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|REINFORCED ASEISMIC STRUCTURE SUITABLE FOR URBAN UNDERGROUND UTILITY TUNNEL
Europäisches Patentamt | 2023
|