Construction of FFTF Containment Vessel and Lock
A general exploration of the design considerations, construction techniques, and test procedures utilized in the erection of a 135-ft (41-m) diam x 186-ft 4-in. (56-m) high full-pressure free-standing steel containment vessel and 25-ft (7.6-m) diam equipment airlock for the Fast Flux Test Facility at Richland, Wash. The use of special erection equipment such as a large capacity guyed derrick is described in this article. Also included is a summary of the unique operating characteristics of the 25-ft (7.6-m) diam equipment airlock.
Construction of FFTF Containment Vessel and Lock
A general exploration of the design considerations, construction techniques, and test procedures utilized in the erection of a 135-ft (41-m) diam x 186-ft 4-in. (56-m) high full-pressure free-standing steel containment vessel and 25-ft (7.6-m) diam equipment airlock for the Fast Flux Test Facility at Richland, Wash. The use of special erection equipment such as a large capacity guyed derrick is described in this article. Also included is a summary of the unique operating characteristics of the 25-ft (7.6-m) diam equipment airlock.
Construction of FFTF Containment Vessel and Lock
Lebre, Robert N. (Autor:in)
Journal of the Construction Division ; 102 ; 325-334
01.01.2021
101976-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Analysis of FFTF primary-containment complex-model experiments
TIBKAT | 1974
|FFTF Materials of Construction and Surveillance Plans
NTIS | 1979
|FFTF Operating and Administrative Index
NTIS | 1976
FFTF Asbestos Location Tracking Program
NTIS | 1994
|