Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tuttle Creek Dam of Rolled Shale and Dredged Sand
To fit available materials , the design of Tuttle Creek Dam in central Kansas includes major volumes of shale-limestone constructed as a rolled fill , and of sand deposited by dredging directly into place, two types of fill not commonly employed in present-day earth dam construction. The reasons for choosing this design are explained, together with experiences learned during construction. The paper covers primarily the earthwork and foundation aspects of the project, of which the other more unusual features are closure “in the wet” and handling an area of weak clay foundation partly by excavation and partly by exceptionally wide berms.
Tuttle Creek Dam of Rolled Shale and Dredged Sand
To fit available materials , the design of Tuttle Creek Dam in central Kansas includes major volumes of shale-limestone constructed as a rolled fill , and of sand deposited by dredging directly into place, two types of fill not commonly employed in present-day earth dam construction. The reasons for choosing this design are explained, together with experiences learned during construction. The paper covers primarily the earthwork and foundation aspects of the project, of which the other more unusual features are closure “in the wet” and handling an area of weak clay foundation partly by excavation and partly by exceptionally wide berms.
Tuttle Creek Dam of Rolled Shale and Dredged Sand
Lane, K. S. (Autor:in) / Fehrman, R. G. (Autor:in)
Transactions of the American Society of Civil Engineers ; 127 ; 492-515
01.01.2021
241962-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Engineering Index Backfile | 1957
|Seismic Retrofit of Tuttle Creek Dam
Online Contents | 2013
|Seismic Retrofit of Tuttle Creek Dam
ASCE | 2012
|