Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The Removal of a Defective Pivot Pier, and Its Reconstruction
On the afternoon of Saturday, September 13th, 1890, the St. Louis, Arkansas and Texas Railway draw span, with four panels of trestle approach, crossing the Ouachita River, at Camden, Ark., was wrecked, a 60-ton Mogul engine and nine loaded freight cars falling into the river with the collapsed structure. Fortunately, no one was injured.
The Removal of a Defective Pivot Pier, and Its Reconstruction
On the afternoon of Saturday, September 13th, 1890, the St. Louis, Arkansas and Texas Railway draw span, with four panels of trestle approach, crossing the Ouachita River, at Camden, Ark., was wrecked, a 60-ton Mogul engine and nine loaded freight cars falling into the river with the collapsed structure. Fortunately, no one was injured.
The Removal of a Defective Pivot Pier, and Its Reconstruction
Kelley, Howard G. (Autor:in)
Transactions of the American Society of Civil Engineers ; 31 ; 277-293
01.01.2021
171894-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Engineering Index Backfile | 1894
|Pivot pier of Chelsea bridge north
Engineering Index Backfile | 1913
Construction of pivot pier, inter-state bridge, Omaha, Neb.
Engineering Index Backfile | 1893
Reconstruction of Craighouse pier
Engineering Index Backfile | 1952
|