Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Late in 1958, Multnomah County completed a new bridge in Portland, Oregon, at a cost of over $13,000,000 to cross the Willamette River and to connect through extensive approaches to downtown streets. This article reports on the construction of the 760-ft river bridge and its approach systems.
Late in 1958, Multnomah County completed a new bridge in Portland, Oregon, at a cost of over $13,000,000 to cross the Willamette River and to connect through extensive approaches to downtown streets. This article reports on the construction of the 760-ft river bridge and its approach systems.
Construction of the Morrison Bridge
Bane, R. D. (Autor:in)
Transactions of the American Society of Civil Engineers ; 126 ; 146-153
01.01.2021
81961-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Construction of Morrison bridge
Engineering Index Backfile | 1960
|Construction of Morrison Bridge
ASCE | 2021
|The new morrison street bridge, Portland, Oregon
Engineering Index Backfile | 1906
|British Library Online Contents | 1997
Online Contents | 1997