VfM-at-Risk Analysis Model for Build–Operate–Transfer Infrastructure Projects
Existing models have failed to capture the stochastic nature of input variables for the value-for-money (VfM) analysis in build–operate–transfer (BOT) infrastructure projects. The present study aims to address this knowledge gap by offering a VfM-at-risk analysis model and developing a stochastic-based model that takes account of the risk allocation scheme and cost efficiency in the valuation. The proposed model can deal with the net-cost and net-revenue projects. This study introduces weighted risk reduction factors to accommodate the interaction between public and private agencies in sharing risk outcomes and a metric to measure the optimality of a risk allocation scheme. A case study based on Indonesia’s BOT water supply project was used to demonstrate the model application. It is shown that cost efficiency and an optimal risk allocation scheme enhance VfM. Moreover, the wisdom of using the BOT option can be challenged when the public agency is at least as good as the private agency unless other reasons exist, and allocating project risk to an agency that cannot best deal with it can reduce VfM. This study concludes with model limitations and directions for future research.
VfM-at-Risk Analysis Model for Build–Operate–Transfer Infrastructure Projects
Existing models have failed to capture the stochastic nature of input variables for the value-for-money (VfM) analysis in build–operate–transfer (BOT) infrastructure projects. The present study aims to address this knowledge gap by offering a VfM-at-risk analysis model and developing a stochastic-based model that takes account of the risk allocation scheme and cost efficiency in the valuation. The proposed model can deal with the net-cost and net-revenue projects. This study introduces weighted risk reduction factors to accommodate the interaction between public and private agencies in sharing risk outcomes and a metric to measure the optimality of a risk allocation scheme. A case study based on Indonesia’s BOT water supply project was used to demonstrate the model application. It is shown that cost efficiency and an optimal risk allocation scheme enhance VfM. Moreover, the wisdom of using the BOT option can be challenged when the public agency is at least as good as the private agency unless other reasons exist, and allocating project risk to an agency that cannot best deal with it can reduce VfM. This study concludes with model limitations and directions for future research.
VfM-at-Risk Analysis Model for Build–Operate–Transfer Infrastructure Projects
J. Infrastruct. Syst.
Wibowo, Andreas (Autor:in)
01.12.2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Build-Operate-Transfer (BOT) Financing in Public Infrastructure Projects
British Library Conference Proceedings | 2000
|Risk Management on Build-Operate-Transfer Projects
British Library Conference Proceedings | 2005
|Risk Concession Model for Build-Operate-Transfer Contract Projects
Online Contents | 2005
|Risk Concession Model for Build/Operate/Transfer Contract Projects
British Library Online Contents | 2005
|Build-Operate-Transfer in Infrastructure Projects in the United States
British Library Online Contents | 2007
|