Rockfill Dams: Wishon And Courtright Concrete Face Dams
Design considerations and construction of the two approximately 300-foot high dams are discussed. All changes in design and construction from previous P. G. and E. dams have been made to lower the cost without affecting the safety of the dams. Wishon was filled in May 1958 and initial crest settlement data is presented.
Rockfill Dams: Wishon And Courtright Concrete Face Dams
Design considerations and construction of the two approximately 300-foot high dams are discussed. All changes in design and construction from previous P. G. and E. dams have been made to lower the cost without affecting the safety of the dams. Wishon was filled in May 1958 and initial crest settlement data is presented.
Rockfill Dams: Wishon And Courtright Concrete Face Dams
Cooke, J. Barry (Autor:in)
Transactions of the American Society of Civil Engineers ; 125 ; 587-619
01.01.2021
331960-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
TIBKAT | 2009
|Rockfill Dams: Paradela Concrete Face Dam
ASCE | 2021
|Concrete face rockfill dams (>50 m)
Tema Archiv | 1998
|Rockfill Modulus and Settlement of Concrete Face Rockfill Dams
Online Contents | 2003
|Rockfill Modulus and Settlement of Concrete Face Rockfill Dams
British Library Online Contents | 2003
|