Remediation of Damaged Shield Tunnel Using Grouting Technique: Serviceability Improvements and Prevention of Potential Risks
Shield tunnel damage induced by excessive and differential tunnel displacement has become a major threat to the operational safety of urban subways in China. Grouting offers an effective way to reduce excessive displacement and ensure structural safety of the damaged shield tunnels. In this paper, a case study on the remediation of an operational shield tunnel in Shenzhen, China, by grouting is presented. The drop of the groundwater level caused by nearby foundation excavation was the main reason for tunnel damage. Grouting outside the tunnel was selected considering the site conditions and construction time limitations. An automatic monitoring system for tunnel displacement was installed. The monitored data showed that parameters including the relative tunnel displacement, the horizontal convergence, and the ovality were all reduced after grouting, indicating that the tunnel serviceability was improved. The deformation of the shield tunnel induced by grouting was composed of translation and shape change. The tunnel displacement remained stable when the foundation excavation was resumed. Careful design and real-time adjustment of grouting parameters are key to the successful implementation of the grouting project.
Remediation of Damaged Shield Tunnel Using Grouting Technique: Serviceability Improvements and Prevention of Potential Risks
Shield tunnel damage induced by excessive and differential tunnel displacement has become a major threat to the operational safety of urban subways in China. Grouting offers an effective way to reduce excessive displacement and ensure structural safety of the damaged shield tunnels. In this paper, a case study on the remediation of an operational shield tunnel in Shenzhen, China, by grouting is presented. The drop of the groundwater level caused by nearby foundation excavation was the main reason for tunnel damage. Grouting outside the tunnel was selected considering the site conditions and construction time limitations. An automatic monitoring system for tunnel displacement was installed. The monitored data showed that parameters including the relative tunnel displacement, the horizontal convergence, and the ovality were all reduced after grouting, indicating that the tunnel serviceability was improved. The deformation of the shield tunnel induced by grouting was composed of translation and shape change. The tunnel displacement remained stable when the foundation excavation was resumed. Careful design and real-time adjustment of grouting parameters are key to the successful implementation of the grouting project.
Remediation of Damaged Shield Tunnel Using Grouting Technique: Serviceability Improvements and Prevention of Potential Risks
Zhu, Min (Autor:in) / Gong, Xiaonan (Autor:in) / Gao, Xiang (Autor:in) / Liu, Shiming (Autor:in) / Yan, Jiajia (Autor:in)
23.08.2019
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Repairing a shield tunnel damaged by secondary grouting
Elsevier | 2018
|Repairing a shield tunnel damaged by secondary grouting
British Library Online Contents | 2018
|Condition assessment of shield tunnel using a new indicator: The tunnel serviceability index
British Library Online Contents | 2017
|Condition assessment of shield tunnel using a new indicator: The tunnel serviceability index
Online Contents | 2017
|Condition assessment of shield tunnel using a new indicator: The tunnel serviceability index
British Library Online Contents | 2017
|