Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Beneath Biscayne Bay
To improve the reliability and resiliency of one of its most critical wastewater components, the Miami-Dade Water and Sewer Department replaced more than a mile of aging force main used to convey flows to its Central District Wastewater Treatment Plant. Installation of the new force main required constructing two large vertical shafts and a large-diameter tunnel beneath a portion of Florida’s Biscayne Bay.
Beneath Biscayne Bay
To improve the reliability and resiliency of one of its most critical wastewater components, the Miami-Dade Water and Sewer Department replaced more than a mile of aging force main used to convey flows to its Central District Wastewater Treatment Plant. Installation of the new force main required constructing two large vertical shafts and a large-diameter tunnel beneath a portion of Florida’s Biscayne Bay.
Beneath Biscayne Bay
Carroll, Terrence (Autor:in) / Whidden, William (Autor:in) / Ramos, Eloy (Autor:in) / Li, Lin (Autor:in) / Fernandez-Cuervo, Victor (Autor:in)
Civil Engineering Magazine Archive ; 88 ; 68-77
01.01.2019
102018-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Biscayne Bay Urban Waterfront Charrette
NTIS | 1981
Dewatering Miami's Biscayne Aquifer
Engineering Index Backfile | 1957
|Design of the Miami, Florida, causeway across Biscayne Bay
Engineering Index Backfile | 1920
|Permitting a large pipeline project across Biscayne Bay
British Library Conference Proceedings | 1995
|HDD Shore Approaches in the Biscayne Bay Marine Sanctuary
British Library Conference Proceedings | 2006
|