Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Crossrail C510 Settlement Control by Grouting at Liverpool Street Station
The paper will detail complex settlement mitigation works at Liverpool Street Station, London, as part of the Crossrail C510 project-including the settlement mitigation strategy and design; methods of working; new and developing aspects of the design of such works; control measures adopted to achieve the specified criteria to ensure long-term stability.
Crossrail C510 Settlement Control by Grouting at Liverpool Street Station
The paper will detail complex settlement mitigation works at Liverpool Street Station, London, as part of the Crossrail C510 project-including the settlement mitigation strategy and design; methods of working; new and developing aspects of the design of such works; control measures adopted to achieve the specified criteria to ensure long-term stability.
Crossrail C510 Settlement Control by Grouting at Liverpool Street Station
Kettle, Clif (Autor:in)
Grouting 2017 ; 2017 ; Honolulu, Hawaii
Grouting 2017 ; 262-273
06.07.2017
Aufsatz (Konferenz)
Elektronische Ressource
Englisch