Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Garrison Dam: Foreword
This symposium describes an extensive 6-yr study of tunnel loading in a 36-ft-diameter tunnel test section at Garrison Dam on the Missouri River, near Bismarck, N. Dak. The tunnel investigation includes the application of the results to the 8 prototype tunnels, construction of these tunnels through clay shale, and examination of their initial performance. The evaluation of these results includes the development of new theoretical concepts.
Garrison Dam: Foreword
This symposium describes an extensive 6-yr study of tunnel loading in a 36-ft-diameter tunnel test section at Garrison Dam on the Missouri River, near Bismarck, N. Dak. The tunnel investigation includes the application of the results to the 8 prototype tunnels, construction of these tunnels through clay shale, and examination of their initial performance. The evaluation of these results includes the development of new theoretical concepts.
Garrison Dam: Foreword
01.01.2021
11960-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Online Contents | 1994
British Library Conference Proceedings | 1998
|NTIS | 1974
|Garrison Dam: Investigation and Construction
ASCE | 2021
|House, Garrison, New York, USA
British Library Online Contents | 2003
|