Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Failure of a Pile Retaining Wall
This paper addresses the failure of a pile retaining wall constructed as a remedial measure to arrest instability of a highway embankment resulting from movement of its sideslope which was contiguous with the valley slope of a nearby creek. A drainage blanket was incorporated within the distressed section of the highway in 1983 to mitigate the pavement distress that was occurring. This remedial measure proved to be effective over a two-year period after which pavement distress re-occurred in the summer of 1990 following a period of increased rainfall. Further geotechnical investigation in 1990 resulted in the construction of a cantilever pile wall to isolate the highway from the perceived slide activity of the highway sideslope. Failure of this pile wall occurred in the summer of 1993 about 3 years after its construction, eventually requiring realignment of the highway. Failure to fully understand the site conditions from the inception of the geotechnical investigation played a major role in the short-lived performance of the remedial measures.
Failure of a Pile Retaining Wall
This paper addresses the failure of a pile retaining wall constructed as a remedial measure to arrest instability of a highway embankment resulting from movement of its sideslope which was contiguous with the valley slope of a nearby creek. A drainage blanket was incorporated within the distressed section of the highway in 1983 to mitigate the pavement distress that was occurring. This remedial measure proved to be effective over a two-year period after which pavement distress re-occurred in the summer of 1990 following a period of increased rainfall. Further geotechnical investigation in 1990 resulted in the construction of a cantilever pile wall to isolate the highway from the perceived slide activity of the highway sideslope. Failure of this pile wall occurred in the summer of 1993 about 3 years after its construction, eventually requiring realignment of the highway. Failure to fully understand the site conditions from the inception of the geotechnical investigation played a major role in the short-lived performance of the remedial measures.
Failure of a Pile Retaining Wall
Diyaljee, Vishnu (Autor:in)
International Foundation Congress and Equipment Expo 2009 ; 2009 ; Orlando, Florida, United States
10.03.2009
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Failure of a Pile Retaining Wall
British Library Conference Proceedings | 2009
|Engineering Index Backfile | 1964
|Europäisches Patentamt | 2023