Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
International Design/Build Firm Loses Constructive Acceleration Claim
Contractors that expect to be compensated for schedule delays must prove conclusively that the delays were excusable and that extensions were sought and denied.
International Design/Build Firm Loses Constructive Acceleration Claim
Contractors that expect to be compensated for schedule delays must prove conclusively that the delays were excusable and that extensions were sought and denied.
International Design/Build Firm Loses Constructive Acceleration Claim
Loulakis, Michael C. (Autor:in) / McLaughlin, Lauren P. (Autor:in)
Civil Engineering Magazine Archive ; 82 ; 84
01.01.2016
12012-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Proving a ‘Constructive Acceleration’ Claim
ASCE | 2016
|British Library Online Contents | 2000
|FCBS loses its fight to build Mildmay Urban Village
British Library Online Contents | 2007