Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lawrence Looks Ahead
For the first phase of a new, 6 mi long water transmission main, the City of Lawrence, Kansas, needed to construct a 36 in. diameter pipeline that would pass beneath a river, a major levee, two rail lines, and a park. By selecting fusible polyvinyl chloride pipe and using horizontal directional drilling to install nearly two-thirds of the initial part of the line, which is 1.25 mi long, the project team overcame several challenges, including those related to corrosion, site access, and maintenance.
Lawrence Looks Ahead
For the first phase of a new, 6 mi long water transmission main, the City of Lawrence, Kansas, needed to construct a 36 in. diameter pipeline that would pass beneath a river, a major levee, two rail lines, and a park. By selecting fusible polyvinyl chloride pipe and using horizontal directional drilling to install nearly two-thirds of the initial part of the line, which is 1.25 mi long, the project team overcame several challenges, including those related to corrosion, site access, and maintenance.
Lawrence Looks Ahead
Heidrick, Jeff (Autor:in) / Ciesielski, Philip (Autor:in) / O’Connell, Michael (Autor:in) / Wilson, Shawn (Autor:in)
Civil Engineering Magazine Archive ; 85 ; 66-71
01.01.2016
62015-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Wiley | 2011
|Engineering Index Backfile | 1937
|Industry looks ahead optimistically
Engineering Index Backfile | 1946
|Detroit auto dealer looks ahead
Engineering Index Backfile | 1945
St. Lawrence project -- Biggest year looms ahead
Engineering Index Backfile | 1957