Collaboration Cuts Costs
Using the design/build method to deliver a critical part of a 50 mi long pipeline project minimized adverse effects on the environment and nearby communities—and saved $10 million in the process. But no underground project is without its unexpected incidents.
Collaboration Cuts Costs
Using the design/build method to deliver a critical part of a 50 mi long pipeline project minimized adverse effects on the environment and nearby communities—and saved $10 million in the process. But no underground project is without its unexpected incidents.
Collaboration Cuts Costs
Williams, Bill (Autor:in) / Stevens, Andrew (Autor:in) / Zietlow, Bill (Autor:in) / Parks, Randy (Autor:in)
Civil Engineering Magazine Archive ; 86 ; 72-81
01.01.2017
102016-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
British Library Online Contents | 2001
Online Contents | 2017
Oilburner Modification Cuts Costs
NTIS | 1977
|British Library Online Contents | 2005
Engineering Index Backfile | 1957
|