Raising Transmission Towers with Energized Lines
The demand for power makes it necessary to build additional lines and also to reconductor existing lines with larger wires. Towers on existing lines are increased in height by adding an extension to the bottom by this method to maintain code ground clearance under new and larger conductors.
Raising Transmission Towers with Energized Lines
The demand for power makes it necessary to build additional lines and also to reconductor existing lines with larger wires. Towers on existing lines are increased in height by adding an extension to the bottom by this method to maintain code ground clearance under new and larger conductors.
Raising Transmission Towers with Energized Lines
Masters, Albert G. (Autor:in) / Gesing, Ernest J. (Autor:in)
Transactions of the American Society of Civil Engineers ; 126 ; 389-398
01.01.2021
101961-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Raising transmission towers with energized lines
Engineering Index Backfile | 1959
|British Library Conference Proceedings | 1995
|Design of towers for transmission lines
Engineering Index Backfile | 1930
|Energized neutral effects on corrugated gas supply lines
SAGE Publications | 2017
|