Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile Group Settlement Estimation — Research to Practice
This paper reviews the evolution of settlement analysis for pile groups, and the transition from research to practice over the past 30 to 40 years. The gradual incorporation of important aspects of reality is reviewed and it is shown that recent research has enabled complex practical problems to now be examined in a systematic, albeit approximate, manner. The significance of various parameters is reviewed and suggestions are given regarding appropriate methods of preliminary and detailed analysis, and of methods whereby the key geotechnical parameters may be assessed. The pitfalls of inappropriate application of theoretical research to practice are illustrated by examples.
Pile Group Settlement Estimation — Research to Practice
This paper reviews the evolution of settlement analysis for pile groups, and the transition from research to practice over the past 30 to 40 years. The gradual incorporation of important aspects of reality is reviewed and it is shown that recent research has enabled complex practical problems to now be examined in a systematic, albeit approximate, manner. The significance of various parameters is reviewed and suggestions are given regarding appropriate methods of preliminary and detailed analysis, and of methods whereby the key geotechnical parameters may be assessed. The pitfalls of inappropriate application of theoretical research to practice are illustrated by examples.
Pile Group Settlement Estimation — Research to Practice
Poulos, H. G. (Autor:in)
GeoShanghai International Conference 2006 ; 2006 ; Shanghai, China
11.05.2006
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Pile Group Settlement Estimation-Research to Practice
British Library Conference Proceedings | 2006
|Pile Group Settlement Estimation: Suitability of Nonlinear Interaction Factors
Online Contents | 2015
|Modified calculation of pile group settlement interaction
TIBKAT | 1988
|