Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Closure to “Probabilistic Estimation and Allocation of Project Time Contingency” by Gabriel A. Barraza
Closure to “Probabilistic Estimation and Allocation of Project Time Contingency” by Gabriel A. Barraza
Closure to “Probabilistic Estimation and Allocation of Project Time Contingency” by Gabriel A. Barraza
Barraza, Gabriel A. (Autor:in)
Journal of Construction Engineering and Management ; 139 ; 255-256
15.01.2013
22013-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Probabilistic Estimation and Allocation of Project Time Contingency
Online Contents | 2011
|