Dewatering the Port Allen Lock Excavation
Thirty-six large-diameter deep wells were installed around the top of the excavation for Port Allen Lock for the purpose of lowering the hydrostatic head in the deep stratum of pervious sand that lies beneath the lock. Specifications for the project required that the number, arrangement, a nd capacity of the wells and pumps be capable of reducing the hydrostatic head in the deep sands to a level 5 ft below the bottom of the excavation ( bout el -26 mlg) with a river stage of 45 ft mean low gulf (mlg). It was required that the ground water table in the excavation areas and behind the excavation slopes belowered as was needed for satisfactory construction operations. After completion of the excavation to within 5 ft of grade, th e water table in the foundation was to be maintained 5 ft or more below the bottom of the excavation until construction work would permit flooding the structure. Approval of the dewatering system was contingent, in part, on its proven performance. After installation o f the deep well system, tests were made to determine its adequacy.
Dewatering the Port Allen Lock Excavation
Thirty-six large-diameter deep wells were installed around the top of the excavation for Port Allen Lock for the purpose of lowering the hydrostatic head in the deep stratum of pervious sand that lies beneath the lock. Specifications for the project required that the number, arrangement, a nd capacity of the wells and pumps be capable of reducing the hydrostatic head in the deep sands to a level 5 ft below the bottom of the excavation ( bout el -26 mlg) with a river stage of 45 ft mean low gulf (mlg). It was required that the ground water table in the excavation areas and behind the excavation slopes belowered as was needed for satisfactory construction operations. After completion of the excavation to within 5 ft of grade, th e water table in the foundation was to be maintained 5 ft or more below the bottom of the excavation until construction work would permit flooding the structure. Approval of the dewatering system was contingent, in part, on its proven performance. After installation o f the deep well system, tests were made to determine its adequacy.
Dewatering the Port Allen Lock Excavation
Mansur, C. I. (Autor:in) / Kaufman, R. I. (Autor:in)
Transactions of the American Society of Civil Engineers ; 126 ; 1037-1057
01.01.2021
211961-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Engineering measurements for port allen lock
Engineering Index Backfile | 1964
|Optimal dewatering of an excavation site
Online Contents | 2012
|Analysis of Port Allen Lock in Elastic-Plastic Soil Medium
British Library Conference Proceedings | 1994
|Dewatering excavation, low sill structure, old river, la
Engineering Index Backfile | 1958
|Dewatering of a Large Excavation Pit by Wellpoints
British Library Conference Proceedings | 1993
|