Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Closure design of the Ordot Dump is being completed in preparation for its ultimate closure in 2007 after a sixty year operational history marred by health, safety, and emissions concerns. Design of the closure will be completed with substantial application of geosynthetics and leading edge technology for containment, erosion control, and long term integrity of the cap.
Closure design of the Ordot Dump is being completed in preparation for its ultimate closure in 2007 after a sixty year operational history marred by health, safety, and emissions concerns. Design of the closure will be completed with substantial application of geosynthetics and leading edge technology for containment, erosion control, and long term integrity of the cap.
Closure of the Ordot Dump, Guam
Wallace, R. B. (Autor:in)
Geo-Frontiers Congress 2005 ; 2005 ; Austin, Texas, United States
09.10.2008
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Research , Erosion , Guam , Geosynthetics , Landfills
Engineering Index Backfile | 1945
Wiley | 1961
|British Library Conference Proceedings | 1998
|Engineering Index Backfile | 1946
|Hydrogeologic setting of Northern Guam
British Library Conference Proceedings | 1995
|