Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stabilization of a 70-ft-High Side-Hill Fill in West Virginia
This paper will present the initial construction, subsequent repair, results of the instrumentation program and subsurface investigation, analyses and the stabilization measures implemented in 2004 to hold and restrain the side-hill fill. Since implementation of the two tiered, anchored sheet pile wall, monitoring has been ongoing and the results of the monitoring program since completion of construction are presented.
Stabilization of a 70-ft-High Side-Hill Fill in West Virginia
This paper will present the initial construction, subsequent repair, results of the instrumentation program and subsurface investigation, analyses and the stabilization measures implemented in 2004 to hold and restrain the side-hill fill. Since implementation of the two tiered, anchored sheet pile wall, monitoring has been ongoing and the results of the monitoring program since completion of construction are presented.
Stabilization of a 70-ft-High Side-Hill Fill in West Virginia
Langan, Bernard (Autor:in) / Meyer, Matthew (Autor:in) / Siller, George (Autor:in)
Earth Retention Conference (ER) 2010 ; 2010 ; Bellevue, Washington, United States
Earth Retention Conference 3 ; 928-935
26.07.2010
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Stabilization of a 70-ft-High Side-Hill Fill in West Virginia
British Library Conference Proceedings | 2010
|Failure of side-hill highway fill
Engineering Index Backfile | 1963
|The anthracite of the Third Hill Mountain, West Virginia
Engineering Index Backfile | 1902
|Behavior of beach fill at Virginia Beach, Virginia
Engineering Index Backfile | 1959
|The use of asphalt emulsion for stabilization in West Virginia
TIBKAT | 1957
|