Howard Hanson Dam Emergency Interim Grout Curtain
Howard A. Hanson Dam has had a history of excessive seepage through its right abutment for pool elevations above 1155 feet. A record pool (elevation 1188.8 feet) was held in 2009. During the post flood drawdown, symptoms indicative of potential piping/internal erosion within the dam's right abutment were observed. In response to these symptoms, the Corps of Engineers moved forward with a number of interim measures to mitigate the risk of piping/internal erosion within the right abutment before the next flood season. One of these measures was a 450-foot-long, two-row grout curtain that was specifically designed to address the area of greatest concern. End of casing grouting with balanced stabilized grouts were utilized to help stabilize the abutment within a very demanding time frame.
Howard Hanson Dam Emergency Interim Grout Curtain
Howard A. Hanson Dam has had a history of excessive seepage through its right abutment for pool elevations above 1155 feet. A record pool (elevation 1188.8 feet) was held in 2009. During the post flood drawdown, symptoms indicative of potential piping/internal erosion within the dam's right abutment were observed. In response to these symptoms, the Corps of Engineers moved forward with a number of interim measures to mitigate the risk of piping/internal erosion within the right abutment before the next flood season. One of these measures was a 450-foot-long, two-row grout curtain that was specifically designed to address the area of greatest concern. End of casing grouting with balanced stabilized grouts were utilized to help stabilize the abutment within a very demanding time frame.
Howard Hanson Dam Emergency Interim Grout Curtain
Sullivan, Ryan P. (Autor:in) / Danielson, Thomas J. (Autor:in)
Proceedings of the Fourth International Conference on Grouting and Deep Mixing ; 2012 ; New Orleans, Louisiana, United States
Grouting and Deep Mixing 2012 ; 1265-1275
17.08.2012
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Dams , Grouting , Highways and roads , Curtain walls , Chemical grouting , Anchors , Cement , Seepage , Cutoffs , Piles , Mixing , Washington , Foundations , Hydraulic structures
Howard Hanson Dam Emergency Interim Grout Curtain
British Library Conference Proceedings | 2012
|British Library Conference Proceedings | 2010
|Grout curtain of Sylvenstein dam
Engineering Index Backfile | 1967
|British Library Conference Proceedings | 1997
|VOILE D'INJECTION DU BARRAGE HOWARD HANSON À WASHINGTON: États-Unis
Online Contents | 2010