Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Integral Lifting of a Three-Span Continuous Beam Bridge
A three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
Integral Lifting of a Three-Span Continuous Beam Bridge
A three-span-continuous girder bridge has to be integrally lifted by 3 m to meet increased navigation capacity. This paper mainly introduces the lifting system mechanism, construction process, and bridge jack-up monitoring. To determine the control threshold value during the construction process and to ensure the safety of successive lifting, a three-dimensional finite-element model is established to analyze the strain and stress distribution characteristics of the bridge. With guidance from the numerical analyses, the three-continuous-span girder bridge is lifted successfully. The design and construction methods adopted in this project provide a useful reference for similar engineering projects.
Integral Lifting of a Three-Span Continuous Beam Bridge
Xu, Changjie (Autor:in) / Xu, Lige (Autor:in) / Zhou, Jian (Autor:in)
19.02.2014
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Integral Lifting of a Three-Span Continuous Beam Bridge
Online Contents | 2015
|Integral Lifting of a Three-Span Continuous Beam Bridge
British Library Online Contents | 2015
|Europäisches Patentamt | 2024
|Steel box girder mid-span continuous section ultra-long span integral lifting construction method
Europäisches Patentamt | 2024
|Dynamic tests of three-span continuous I-beam highway bridge
Engineering Index Backfile | 1961
|