Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Study on Ground Settlement Induced by Shield Tunnel Construction in Sandy Gravel Stratum
In sandy gravel stratum, individual characteristic is prominent and ground structure is loose. Point-to-point contact model is popular between ground particles. Such ground is easy to be disturbed and remarkable ground loss often appears during shield construction process. The discrete element method (DEM) is applied to investigate the ground movement and disturbance induced by tunnel construction using the software PFC2D (Particle Flow Code in 2 dimensions). Ground settlement distributions at various ground loss ratios were obtained for twin tunnels with 0.5D and 1D clear distance. Loosing, collapse and arch formation of the ground were all revealed at meantime. This work can offer references to control and prevent the disturbance caused by shield tunnel construction in sandy gravel stratum.
Study on Ground Settlement Induced by Shield Tunnel Construction in Sandy Gravel Stratum
In sandy gravel stratum, individual characteristic is prominent and ground structure is loose. Point-to-point contact model is popular between ground particles. Such ground is easy to be disturbed and remarkable ground loss often appears during shield construction process. The discrete element method (DEM) is applied to investigate the ground movement and disturbance induced by tunnel construction using the software PFC2D (Particle Flow Code in 2 dimensions). Ground settlement distributions at various ground loss ratios were obtained for twin tunnels with 0.5D and 1D clear distance. Loosing, collapse and arch formation of the ground were all revealed at meantime. This work can offer references to control and prevent the disturbance caused by shield tunnel construction in sandy gravel stratum.
Study on Ground Settlement Induced by Shield Tunnel Construction in Sandy Gravel Stratum
Fang, Yong (Autor:in) / Wang, Jun (Autor:in) / Jiang, Yinchao (Autor:in) / He, Chuan (Autor:in)
International Conference on Pipelines and Trenchless Technology ; 2012 ; Wuhan, China
ICPTT 2012 ; 1567-1573
13.11.2012
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Inspection , Construction , Installation , Tunnels , Risk management , Infrastructure , Corrosion , Leakage , Gravel , Rehabilitation , Soil stabilization , Pipelines , Monitoring
Europäisches Patentamt | 2015
|Prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum
DOAJ | 2024
|Prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum
Elsevier | 2024
|Shield normal-pressure tool changing method in water-rich sandy gravel stratum
Europäisches Patentamt | 2023
|Construction method for waterproof curtain of sandy gravel stratum
Europäisches Patentamt | 2022
|