Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk Priority Number for Bridge Failures
One of the important and systematic methods that is used for the identification of failure of any system is the failure mode and effect analysis (FMEA). This is carried out through the identification of the most important causes of all the failure modes of a system under consideration. FMEA is based on the concepts of a probabilistic analysis. In the present study, a corresponding equivalent deterministic method has been developed in terms of a risk priority number (RPN) formulation with its application to bridge failures. The RPN will enable the practicing engineers to rank various bridge failures and take necessary steps to mitigate the associated risk.
Risk Priority Number for Bridge Failures
One of the important and systematic methods that is used for the identification of failure of any system is the failure mode and effect analysis (FMEA). This is carried out through the identification of the most important causes of all the failure modes of a system under consideration. FMEA is based on the concepts of a probabilistic analysis. In the present study, a corresponding equivalent deterministic method has been developed in terms of a risk priority number (RPN) formulation with its application to bridge failures. The RPN will enable the practicing engineers to rank various bridge failures and take necessary steps to mitigate the associated risk.
Risk Priority Number for Bridge Failures
Putcha, Chandrasekhar (Autor:in) / Dutta, Subhrajit (Autor:in) / Rodriguez, Jessica (Autor:in)
09.03.2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Bridge failures, hazards and societal risk
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1946
|Specifications and Bridge Failures
Wiley | 2021
|Specifications and Bridge Failures
Wiley | 2013
|LESSONS FROM HISTORICAL BRIDGE FAILURES
British Library Online Contents | 2008
|