Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building the Bayfront: The Corpus Christi Seawall
Without a doubt, the single most important chapter in the history of the City's bay front, after the 1919 hurricane, was the Corpus Christi Seawall. From conception to completion took over 20 years. The project included the building of the Municipal Marina, expanding the bay front between Water Street and the seawall, and the development of drainage for the downtown area of the City. The Corpus Christi Seawall was designated as a Texas Historic Civil Engineering Landmark in 1988.
Building the Bayfront: The Corpus Christi Seawall
Without a doubt, the single most important chapter in the history of the City's bay front, after the 1919 hurricane, was the Corpus Christi Seawall. From conception to completion took over 20 years. The project included the building of the Municipal Marina, expanding the bay front between Water Street and the seawall, and the development of drainage for the downtown area of the City. The Corpus Christi Seawall was designated as a Texas Historic Civil Engineering Landmark in 1988.
Building the Bayfront: The Corpus Christi Seawall
Wuensche, Vernon A. (Autor:in)
Third National Congress on Civil Engineering History and Heritage ; 2001 ; Houston, Texas, United States
05.10.2001
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Building the Bayfront: The Corpus Christi Seawall
British Library Conference Proceedings | 2001
|Evaluation of the Corpus Christi Seawall
ASCE | 2001
|Seawall and waterfront development completed at Corpus Christi
Engineering Index Backfile | 1941
Comparison of Beach Profiles At a Seawall and Groins, Corpus Christi, Texas
British Library Online Contents | 1998
|