Hazard-Based Analysis of Highway Project Development Times
Transport agencies around the world recognize the importance of on-time on-budget delivery of highway projects and understand the need for an efficient transport development process. Past studies of highway project duration and cost estimation were focused on construction, and few studies have focused on preconstruction project delivery from an agency’s perspective. This paper proposes the use of hazard-based duration models for investigating the potential risk factors that could affect project development time from planning to letting. A database containing over 35 years of highway project data from the state of Indiana was used to develop appropriate models. Of the three model forms (Weibull, Weibull with gamma heterogeneity, and log-logistic) considered in the paper, it was found that the log-logistic model is the most appropriate for modeling project development time. For each work category (pavement, bridge, and road/interchange projects), risk factors were identified, and their influences on project development time (and consequently, on letting time) were investigated. The developed hazard-based duration models were further applied to demonstrate their ability to predict expected project development time for delivery and the project-related factors that influence this duration, thereby providing the agency with a useful interpretation of associated delivery risks.
Hazard-Based Analysis of Highway Project Development Times
Transport agencies around the world recognize the importance of on-time on-budget delivery of highway projects and understand the need for an efficient transport development process. Past studies of highway project duration and cost estimation were focused on construction, and few studies have focused on preconstruction project delivery from an agency’s perspective. This paper proposes the use of hazard-based duration models for investigating the potential risk factors that could affect project development time from planning to letting. A database containing over 35 years of highway project data from the state of Indiana was used to develop appropriate models. Of the three model forms (Weibull, Weibull with gamma heterogeneity, and log-logistic) considered in the paper, it was found that the log-logistic model is the most appropriate for modeling project development time. For each work category (pavement, bridge, and road/interchange projects), risk factors were identified, and their influences on project development time (and consequently, on letting time) were investigated. The developed hazard-based duration models were further applied to demonstrate their ability to predict expected project development time for delivery and the project-related factors that influence this duration, thereby providing the agency with a useful interpretation of associated delivery risks.
Hazard-Based Analysis of Highway Project Development Times
Ong, G. P. (Autor:in) / Fitzpatrick, V. (Autor:in) / Labi, S. (Autor:in) / Sinha, K. C. (Autor:in)
Journal of Transportation Engineering ; 138 ; 1259-1268
08.03.2012
102012-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Englisch
Hazard-Based Analysis of Highway Project Development Times
Online Contents | 2012
|Seismic Hazard Analysis for the I-15 Highway Corridor Expansion Project
British Library Conference Proceedings | 1997
|An exploratory hazard-based analysis of highway incident duration
Elsevier | 2000
|An exploratory hazard-based analysis of highway incident duration
Online Contents | 2000
|Highway Guardrails: Safety Feature or Roadside Hazard?
British Library Online Contents | 1994
|