Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intake Tower Seismic Upgrade with Post-Tensioned Anchors: Design and Construction Aspects
The South Fork Tolt Dam Intake Tower was designed and built in accordance with the standards of practice current in the early 1960's. Thirty years later, analysis based on modern structural design criteria and updated seismic hazard data concluded that the tower was highly vulnerable to earthquake damage and needed strengthening. Due to the critical importance of the water supply, the Owner mandated that the reservoir remain in service and that water quality be protected during the repair work. The innovative seismic upgrade design called for six high-capacity post-tensioned anchors, installed into holes drilled with high accuracy down through the thin walls of the tall, slender structure. Specialized construction techniques and equipment were employed to successfully complete this challenging project, which required some of the largest and longest post-tensioned anchors ever used to seismically strengthen an intake tower structure.
Intake Tower Seismic Upgrade with Post-Tensioned Anchors: Design and Construction Aspects
The South Fork Tolt Dam Intake Tower was designed and built in accordance with the standards of practice current in the early 1960's. Thirty years later, analysis based on modern structural design criteria and updated seismic hazard data concluded that the tower was highly vulnerable to earthquake damage and needed strengthening. Due to the critical importance of the water supply, the Owner mandated that the reservoir remain in service and that water quality be protected during the repair work. The innovative seismic upgrade design called for six high-capacity post-tensioned anchors, installed into holes drilled with high accuracy down through the thin walls of the tall, slender structure. Specialized construction techniques and equipment were employed to successfully complete this challenging project, which required some of the largest and longest post-tensioned anchors ever used to seismically strengthen an intake tower structure.
Intake Tower Seismic Upgrade with Post-Tensioned Anchors: Design and Construction Aspects
Feldsher, Theodore B. (Autor:in) / Krumm, Paul (Autor:in) / Rollins, Greg (Autor:in) / Harrington, Laurel (Autor:in)
Geo-Denver 2000 ; 2000 ; Denver, Colorado, United States
24.07.2000
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Intake Tower Seismic Upgrade with Post-Tensioned Anchors: Design and Construction Aspects
British Library Conference Proceedings | 2000
|Seismic Upgrade of Intake Tower with High-Capacity Post-Tensioned Anchors
British Library Conference Proceedings | 1999
|Post-tensioned Anchors in Karst Foundation
British Library Conference Proceedings | 2013
|CEMENTITIOUS FOUNDATION CAP WITH POST-TENSIONED HELICAL ANCHORS
Europäisches Patentamt | 2020
|Casad Dam Intake Tower Upgrade Using Seismic Dampers
British Library Conference Proceedings | 2005
|