Ontology-based Investigation of Construction Delay Analysis Methodologies in Egypt
Delays in construction projects are more commonplace than most of us wish. The intensified market competition is driving all to accept tighter schedules, shrinking budgets, and slimmer contingency allowances. Such pressures give rise to claims, disputes, and litigation in courts. Understanding how to utilize the critical path method (CPM) delay analysis methodologies (DAMs) is inevitable to resolving these problematic project situations. This study was initiated to investigate the level of awareness, frequency of usage, information needs, complexity of application, and success rate of each CPM DAM used in the Egyptian construction market where authors work or had worked previously. Research was conducted through a triangulation approach for data collection that employed a quantitative questionnaire and a qualitative interview. Distribution of questionnaires followed a thorough analysis of the market structure, size of organizations in the Egyptian construction market, and the required sample size to reflect the differences between the targeted groups sufficiently. Collected data were analyzed subsequently with the aid of SPSS software. An unbiased hypothetical determination of the level of awareness, usage, and success rate of each DAM among different groups within the Egyptian construction market shall develop an understanding of the DAMs that should be adopted for a more successful settlement and resolution of disputes.
Ontology-based Investigation of Construction Delay Analysis Methodologies in Egypt
Delays in construction projects are more commonplace than most of us wish. The intensified market competition is driving all to accept tighter schedules, shrinking budgets, and slimmer contingency allowances. Such pressures give rise to claims, disputes, and litigation in courts. Understanding how to utilize the critical path method (CPM) delay analysis methodologies (DAMs) is inevitable to resolving these problematic project situations. This study was initiated to investigate the level of awareness, frequency of usage, information needs, complexity of application, and success rate of each CPM DAM used in the Egyptian construction market where authors work or had worked previously. Research was conducted through a triangulation approach for data collection that employed a quantitative questionnaire and a qualitative interview. Distribution of questionnaires followed a thorough analysis of the market structure, size of organizations in the Egyptian construction market, and the required sample size to reflect the differences between the targeted groups sufficiently. Collected data were analyzed subsequently with the aid of SPSS software. An unbiased hypothetical determination of the level of awareness, usage, and success rate of each DAM among different groups within the Egyptian construction market shall develop an understanding of the DAMs that should be adopted for a more successful settlement and resolution of disputes.
Ontology-based Investigation of Construction Delay Analysis Methodologies in Egypt
Magdy Ahmed, Mohamed (Autor:in) / Georgy, Maged (Autor:in) / Osman, Hesham (Autor:in)
Construction Research Congress 2014 ; 2014 ; Atlanta, Georgia
Construction Research Congress 2014 ; 1428-1437
13.05.2014
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Consultants' Perceptions on Construction Delay Analysis Methodologies
Online Contents | 2009
|Consultants' Perceptions on Construction Delay Analysis Methodologies
British Library Online Contents | 2009
|An ontology-based approach for delay analysis in construction
Online Contents | 2018
|An ontology-based approach for delay analysis in construction
Springer Verlag | 2017
|Comparison of various delay analysis methodologies for construction projects
British Library Conference Proceedings | 2008
|