Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Effect of Subway Tunnel Excavation by Drill-Blasting Method on Pipeline
Drill-blasting method is used in subway tunnel excavation, when the tunnel located in soil-stone assorted strata. However, the study on pipeline next to subway tunnel is not enough now, when drill-blasting excavation is used in subway tunnel construction. The stress and displacement of pipeline is studied, when blasting load is considered in FLAC3D software in subway tunnel excavation. In the study, pipeline characters have been considered. It shows that: (1) Because of the physico-mechanical parameters of pipeline and of soil stratum, when the position of pipeline and tunnel is vertical, displacement of pipeline less than when is horizontal. When the position is vertical, tension and compression stress of pipeline is bigger than that is horizontal. (2) During the excavation, the factors that affect on the stress of pipeline remarkably include diameters, thickness, materials, and joints. (3) The factors that affect on the displacement of pipeline significantly include diameter of pipeline, depth of pipeline, and joints.
Effect of Subway Tunnel Excavation by Drill-Blasting Method on Pipeline
Drill-blasting method is used in subway tunnel excavation, when the tunnel located in soil-stone assorted strata. However, the study on pipeline next to subway tunnel is not enough now, when drill-blasting excavation is used in subway tunnel construction. The stress and displacement of pipeline is studied, when blasting load is considered in FLAC3D software in subway tunnel excavation. In the study, pipeline characters have been considered. It shows that: (1) Because of the physico-mechanical parameters of pipeline and of soil stratum, when the position of pipeline and tunnel is vertical, displacement of pipeline less than when is horizontal. When the position is vertical, tension and compression stress of pipeline is bigger than that is horizontal. (2) During the excavation, the factors that affect on the stress of pipeline remarkably include diameters, thickness, materials, and joints. (3) The factors that affect on the displacement of pipeline significantly include diameter of pipeline, depth of pipeline, and joints.
Effect of Subway Tunnel Excavation by Drill-Blasting Method on Pipeline
Yu, Yongyan (Autor:in) / Gao, Yongtao (Autor:in) / Du, Zijian (Autor:in)
Transportation Research Congress 2016 ; 2016 ; Beijing, China
Transportation Research Congress 2016 ; 521-529
06.02.2018
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Effect of excavation blasting vibration on adjacent buried gas pipeline in a metro tunnel
British Library Online Contents | 2018
|Subway tunnel deformation control method for ultra-short-distance excavation above subway
Europäisches Patentamt | 2022
|Dynamic Analysis of Tunnel Blasting Excavation Effect on Overpass
Trans Tech Publications | 2014
|