Grouting to Minimize Settlements Prior to Tunnel Excavation—A Case Study
Phase I of the Glen Echo Creek Culvert Reconstruction Project, involved lowering the invert of an existing concrete arch tunnel along with replacing an existing corrugated metal pipe (CMP) with a new tunnel between 28th and 29th street in Oakland, California. All construction work was performed within the tunnel by hand mining techniques. Due to the close proximity to residential buildings, roadways and utilities, various grouting techniques were applied to minimize ground settlement, stabilize subgrade soils and reduce water seepage to facilitate hand excavation. This paper describes the design and execution of the various grouting programs implemented, as well as the grouting performance.
Grouting to Minimize Settlements Prior to Tunnel Excavation—A Case Study
Phase I of the Glen Echo Creek Culvert Reconstruction Project, involved lowering the invert of an existing concrete arch tunnel along with replacing an existing corrugated metal pipe (CMP) with a new tunnel between 28th and 29th street in Oakland, California. All construction work was performed within the tunnel by hand mining techniques. Due to the close proximity to residential buildings, roadways and utilities, various grouting techniques were applied to minimize ground settlement, stabilize subgrade soils and reduce water seepage to facilitate hand excavation. This paper describes the design and execution of the various grouting programs implemented, as well as the grouting performance.
Grouting to Minimize Settlements Prior to Tunnel Excavation—A Case Study
Heenan, Douglas M. (Autor:in) / Xu, Michael (Autor:in)
Third International Conference on Grouting and Ground Treatment ; 2003 ; New Orleans, Louisiana, United States
Grouting and Ground Treatment ; 1546-1556
29.01.2003
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
Mixing , Compaction , Grouting , California , Settlement , Case studies , Jet grouting , Excavation , Tunnels
Grouting to Minimize Settlements Prior to Tunnel Excavation-A Case Study
British Library Conference Proceedings | 2003
|Estimated settlements during the Brescia Metrobus tunnel excavation
British Library Conference Proceedings | 2010
|Ultra-deep hole grouting method during underground excavation of tunnel
Europäisches Patentamt | 2015
|Full-face grouting-based CRD excavation method for underpassing bridge tunnel
Europäisches Patentamt | 2020
|Evaluation of superficial settlements in low overburden tunnel TBM excavation: Numerical approaches
Online Contents | 2005
|