Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Schedule Development under Stochastic Scheduling
A most effective use of Monte-Carlo schedule generation is to create a control schedule of the planning, design and construction of a major project. The normal Monte-Carlo process will yield a distribution for the time required for project completion, activity criticality and list potential critical paths. A methodology is described whereby milestone dates can be created at selected node points within the project without the necessity to maintain an entire record of each possible outcome at these nodes. The methodology utilizes the first four moments about the mean and the Edgeworth Series Method. Examples are presented to demonstrate the methodology.
Schedule Development under Stochastic Scheduling
A most effective use of Monte-Carlo schedule generation is to create a control schedule of the planning, design and construction of a major project. The normal Monte-Carlo process will yield a distribution for the time required for project completion, activity criticality and list potential critical paths. A methodology is described whereby milestone dates can be created at selected node points within the project without the necessity to maintain an entire record of each possible outcome at these nodes. The methodology utilizes the first four moments about the mean and the Edgeworth Series Method. Examples are presented to demonstrate the methodology.
Schedule Development under Stochastic Scheduling
Crandall, Keith C. (Autor:in) / Woolery, John C. (Autor:in)
Journal of the Construction Division ; 108 ; 321-329
01.01.2021
91982-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
A Berth Scheduling Problem under Sailing Schedule Disruption
British Library Conference Proceedings | 2010
|Advanced Stochastic Schedule Simulation System
Taylor & Francis Verlag | 2012
|Stochastic simulation and schedule optimization
British Library Conference Proceedings | 2001
|Advanced Stochastic Schedule Simulation System
British Library Online Contents | 2012
|Advanced Stochastic Schedule Simulation System
Online Contents | 2012
|