Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
History of Evasive Contract Phrases
Evasive contract phrases traditionally used in the general conditions of construction contracts require the contractor to idemnify and protect the owner and his agent (the engineer) against all claims regardless of the adequacy of the design, to investigate the site, design all temporary supporting structures, be liable for all damages, and assume all risks. This procedure developed in England during the late 18th Century with the Industrial Revolution as industry demanded uniform justice for expediency's sake, holding that all risks could be adequately compensated. Prior to this, caveatory, disclaimer, and exculpatory phrases were not allowed in agreements. Contract disputes were adjudicated in courts of Equity which sought substantive fairness, justice, and equality for all parties regardless of the contract terms. The present system places engineering design responsibilities on the contractor which he is not professionally capable of bearing. Reform is needed, and it must come from the engineers.
History of Evasive Contract Phrases
Evasive contract phrases traditionally used in the general conditions of construction contracts require the contractor to idemnify and protect the owner and his agent (the engineer) against all claims regardless of the adequacy of the design, to investigate the site, design all temporary supporting structures, be liable for all damages, and assume all risks. This procedure developed in England during the late 18th Century with the Industrial Revolution as industry demanded uniform justice for expediency's sake, holding that all risks could be adequately compensated. Prior to this, caveatory, disclaimer, and exculpatory phrases were not allowed in agreements. Contract disputes were adjudicated in courts of Equity which sought substantive fairness, justice, and equality for all parties regardless of the contract terms. The present system places engineering design responsibilities on the contractor which he is not professionally capable of bearing. Reform is needed, and it must come from the engineers.
History of Evasive Contract Phrases
Thompson, Louis J. (Autor:in) / Portis, Cynthia Thompson (Autor:in)
Journal of the Construction Division ; 104 ; 525-537
01.01.2021
131978-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Evasive attacks against autoencoder-based cyberattack detection systems in power systems
DOAJ | 2024
|Redox Dichotomy in Cell Fate Decision: Evasive Mechanism or Achilles Heel?
British Library Online Contents | 2018
|DOAJ | 2022
|