Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Operation of the Conowingo Hydroelectric Plant
Large run-of-river hydroelectric (or “hydro”) developments on rivers with extremely wide variations in flow can only be justified on a sound economic basis provided such plants can be operated in conjunction with a large steam generating system so as to attain the greatest possible economic use of the hydroelectric power. By reducing the steam generating costs to a minimum, over-all economies can be effected to ∼aximum advantage for the entire system. Allocation of hydroelectric energy to the best advantage requires determinative river flow forecasting, proper use of pondage, maintenance of head, and station efficiency so that maximum capacity and maximum energy can be obtained from the available water to replace the most expensive steam generation. This paper presents in detail the methods by which the various factors are analyzed to determine the most effective operation sequences for a large hydroelectric installation.
Operation of the Conowingo Hydroelectric Plant
Large run-of-river hydroelectric (or “hydro”) developments on rivers with extremely wide variations in flow can only be justified on a sound economic basis provided such plants can be operated in conjunction with a large steam generating system so as to attain the greatest possible economic use of the hydroelectric power. By reducing the steam generating costs to a minimum, over-all economies can be effected to ∼aximum advantage for the entire system. Allocation of hydroelectric energy to the best advantage requires determinative river flow forecasting, proper use of pondage, maintenance of head, and station efficiency so that maximum capacity and maximum energy can be obtained from the available water to replace the most expensive steam generation. This paper presents in detail the methods by which the various factors are analyzed to determine the most effective operation sequences for a large hydroelectric installation.
Operation of the Conowingo Hydroelectric Plant
Turner, Robert E. (Autor:in)
Transactions of the American Society of Civil Engineers ; 114 ; 79-98
01.01.2021
201949-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Operation of Conowingo hydroelectric plant
Engineering Index Backfile | 1947
|The conowingo hydroelectric development on the Susquehanna river
Engineering Index Backfile | 1928
|The Conowingo hydroelectric development on the Susquehanna River
Engineering Index Backfile | 1927
|Conowingo power plant, Susquehanna river
Engineering Index Backfile | 1928