Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
A simple approach to predict the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method, subjected to pore pressure is presented. As to the analysis on the response of a single pile installed beneath the tunnel, a softening nonlinear model was adopted to predict the relationship between unit skin friction and pile-soil relative displacement developed along the pile-soil interface and a bilinear base load-displacement model was used to predict the relationship developed at the pile end. To analyze the settlement of ground surface during the construction of metro tunneling using PBA method, a highly effective iterative computer program was developed. In order to demonstrate the effectiveness and accuracy of the proposed simple method in this paper, the result is compared with one well-instrumented previous test. The proposed simple analytical approach is economical and efficient, and suitable for the analysis of the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method subjected to pore pressure.
Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
A simple approach to predict the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method, subjected to pore pressure is presented. As to the analysis on the response of a single pile installed beneath the tunnel, a softening nonlinear model was adopted to predict the relationship between unit skin friction and pile-soil relative displacement developed along the pile-soil interface and a bilinear base load-displacement model was used to predict the relationship developed at the pile end. To analyze the settlement of ground surface during the construction of metro tunneling using PBA method, a highly effective iterative computer program was developed. In order to demonstrate the effectiveness and accuracy of the proposed simple method in this paper, the result is compared with one well-instrumented previous test. The proposed simple analytical approach is economical and efficient, and suitable for the analysis of the settlement of ground surface during the construction of metro tunneling using pile-beam-arch (PBA) method subjected to pore pressure.
Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure
Xu, Fei (Autor:in) / Li, Li-Ping (Autor:in) / Zhang, Qian-Qing (Autor:in) / Wang, Zhe-Chao (Autor:in) / He, Peng (Autor:in)
Fourth Geo-China International Conference ; 2016 ; Shandong, China
Geo-China 2016 ; 243-250
21.07.2016
Aufsatz (Konferenz)
Elektronische Ressource
Englisch
British Library Conference Proceedings | 2016
|Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
Trans Tech Publications | 2011
|Numerical Analysis of Metro Station Construction by Large-Diameter Shield and Pile-Beam-Arch Method
British Library Conference Proceedings | 2012
|The Surface Settlement Law of Precipitation in Pile-Beam-Arch Station Adjacent to Pile Foundation
Springer Verlag | 2023
|