Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Stilling Basin Damage at Chief Joseph Dam
200 ft high dam has tainter-gate controlled ogee spillway that discharges into hydraulic jump-type, energy dissipator with single row of baffles and end sill; damages in concrete of stilling basin were discovered 2 yr after project became operative; evaluation of conditions that are considered to have contributed to damage.
Stilling Basin Damage at Chief Joseph Dam
200 ft high dam has tainter-gate controlled ogee spillway that discharges into hydraulic jump-type, energy dissipator with single row of baffles and end sill; damages in concrete of stilling basin were discovered 2 yr after project became operative; evaluation of conditions that are considered to have contributed to damage.
Stilling Basin Damage at Chief Joseph Dam
Gedney, R. H. (Autor:in)
Journal of the Hydraulics Division ; 87 ; 97-120
01.01.2021
241961-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Stilling basin damage at Chief Joseph dam
Engineering Index Backfile | 1961
|ASCE | 2021
|Engineering Index Backfile | 1961
|ASCE | 2021
|