Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Quabbin Dike Built by Hydraulic Fill Method
The thorough investigations of materials available for earth dam construction furnish not only the proper information by which to decide the type, dimensions, and cost of the earth dam to be built, but they furnish sufficient data to enable contractors to bid intelligently. Such bidding tends toward more economical and satisfactory construction.
Quabbin Dike Built by Hydraulic Fill Method
The thorough investigations of materials available for earth dam construction furnish not only the proper information by which to decide the type, dimensions, and cost of the earth dam to be built, but they furnish sufficient data to enable contractors to bid intelligently. Such bidding tends toward more economical and satisfactory construction.
Quabbin Dike Built by Hydraulic Fill Method
Dore, Stanley M. (Autor:in)
Transactions of the American Society of Civil Engineers ; 103 ; 1396-1413
01.01.2021
181938-01-01 pages
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Hydraulic fill at Quabbin Dike
Engineering Index Backfile | 1936
Discussion on Quabbin Dams and Aqueduct
ASCE | 2021
|Novel earth handling at Quabbin dam
Engineering Index Backfile | 1938
|Novel earth handling at Quabbin dam
Engineering Index Backfile | 1938
|Emergency Action Planning for Quabbin Reservoir
British Library Conference Proceedings | 1992
|